Train Controller

Pacific National. Woolangoong

Case Study

Overview

Pacific National operates in Port Kembla, NWS. They control entire transportation of materials from trains to the ports. They need clear visibility on rail conditions in order to schedule access to the services.

Problem

One operator, 4 big screens with very small details. Rail map based on geographic accuracy instead of schematic representation.
Too many small details that require critical attention and high levels of human error input due to fatigue.

Solution

Single panoramic screen. Schematic representation of the rail system. Toggle panels and contextual menus displaying only relevant information