PRD and project template
The project folder template, the required PRD sections and frontmatter, the phase index files with their exit criteria, and how projects are created, drafted from research and retrofitted.
Project folder structure
Every project is created from <CENTRAL>/project-template/:
<PROJECTS>/<Project name>/
├── README.md at a glance, background, folder map, commands
├── PRD.md objectives → kanban; the project's single control document
├── CLAUDE.md project facts only (no rules)
├── .gitignore ignores phases/*/research/, secrets, build output
├── .claude/settings.json ask before editing research; deny reading .env
└── phases/
├── 01-understand/
│ ├── _index.md
│ └── research/ raw research, local only, never committed
├── 02-define/ (_index.md, research/)
├── 03-sketch/ (_index.md, research/)
├── 04-decide/ (_index.md, research/)
├── 05-validate/ (_index.md, research/)
└── 06-deliver/
├── _index.md
└── prototypes/ front-end prototypes
There are five research folders, one in each of phases/01-understand/ to phases/05-validate/; phases/06-deliver/ holds prototypes/ instead. The research folders are local only and never committed. Empty folders hold a .gitkeep in central; the new-project tool re-creates them, because git ignores the research folders.
File naming: <nn>-<step>-<topic>.md, lowercase with hyphens, for example 02-define-problem-statement.md.
PRD.md
Frontmatter
---
title: <Project name> PRD
description: Objectives, scope, decisions and the kanban board for <Project name>.
doc_type: prd
project: <Project name>
process_step: understand
brand: all
status: draft
owner: <decider>
created: YYYY-MM-DD
updated: YYYY-MM-DD
governance_version: 1.0.0
contains_pii: false
decider: <full name>
decider_address: <how to address them>
---
governance_version is the version of your own central install that the project was created or retrofitted under; a new install starts at 1.0.0.
Required sections (any order)
These fourteen sections are required in every PRD, central’s included, and prd-card-reviewer check 1 checks for exactly this list.
| Section | Content | Who fills it |
|---|---|---|
| Objectives | What we want to achieve | Brief, or research draft |
| Goals | Measurable or observable aims | Brief, or research draft |
| Scope | What is included | Brief |
| Not in scope | What is excluded | Brief |
| Hard stops | What must not happen whatever the solution | Brief |
| Outputs | What the project produces | Brief |
| Definition of done | How we know it is finished | Brief |
| Success measures | Table: Measure, Baseline, Target, Source. Drafted early, confirmed in Deliver | Brief, research, Deliver |
| Named decider | Name, address form, handover rule | Brief |
| Current process step | Current step and the step table (Step, Status, Gate passed, Approved by) | Process gate |
| Define sentence | Status, Sentence, Evidence, Agreed by / date | Decider agrees |
| Decision record | Option table (Option, Likely benefit, Likely cost, Traces to Define), Winner, Why it won, Why others did not, Decided by / date | Decider |
| Brand applicability | Default (all brands), exception table (ID, What differs, Brand, Why, Source, Approved by) | Decider approves exceptions |
| Kanban | Release block, Board, Cards | Kanban and release skills |
Empty sections hold TBC or the template’s explicit “not yet” wording, never a leftover {{PLACEHOLDER}}.
Claim marks when drafted from research
| Mark | Meaning | After approval |
|---|---|---|
| [research] | Stated in a source (cite the summary theme) | Replaced by an Evidence: line pointing to the summary |
| [inferred] | The AI’s reading of several sources | Kept, so assumptions stay visible |
| TBC | The research has no answer | Kept |
Never invent numbers, owners or dates.
README.md and CLAUDE.md
- README.md: at-a-glance table (brands, decider, current step and board pointers, governance), background, folder map, commands table for the skills.
- CLAUDE.md: five or six bullet lines of project facts (summary, brands, decider, where the step and board live, governance version location, where raw research lives). It never repeats a rule.
Phase index files
Each _index.md has: Goal, Exit criteria (checkboxes), Expected outputs, AI may, Human gate. Key exit criteria:
| Step | Exit criteria |
|---|---|
Understand (01-understand) | Who experiences the problem, what they are trying to do, what evidence supports it, why it matters; research summary written |
Define (02-define) | The customer, the need and what we learned in one sentence; cites Understand evidence; the team can say it; decider agreed it; customer types, a map of the customer’s path and sharper questions for Sketch written |
Sketch (03-sketch) | Many genuinely different concepts; no early convergence; no ranking language |
Decide (04-decide) | Decider picked 2 or 3 options; benefit and cost per option; winner and reasoning recorded; assumptions known |
Validate (05-validate) | Evidence customers understand the solution, tasks achievable, risks addressed, or design changes identified |
Deliver (06-deliver) | Every state for every screen; accessibility requirements per screen with accessible names and announcements; business rules; success measures with baseline, target, source; design QA plan with keyboard and screen-reader checks; launched and tracked; learnings documented; new questions logged |
Project settings and git
.claude/settings.json:
{
"permissions": {
"ask": ["Edit(**/phases/*/research/**)"],
"deny": ["Read(**/.env)", "Read(**/.env.*)"]
}
}
.gitignore ignores phases/*/research/, .env, .env.*, key and certificate files, .npmrc, .claude/settings.local.json, CLAUDE.local.md, node_modules/, dist/, .astro/ and OS files.
Project lifecycle
| Situation | Skill | Result |
|---|---|---|
| New project | /<PLUGIN>:new-project <name> + brief | Folder created by script; README and PRD drafted from the brief; starts at Understand with no Define sentence and no release |
| Project has research | /<PLUGIN>:prd-from-research | De-identified research summary plus PRD sections, each claim marked, written only after the decider approves |
| Project exists but predates governance | /<PLUGIN>:retrofit-project | Dry-run plan and diff; backup; applies only approved items |
| Start delivering work | /<PLUGIN>:release open | 2 to 5 outcomes fixed |
| Move a step | /<PLUGIN>:process-gate advance | Exit criteria checked, reviewer run, decider approves |
The copy-and-paste briefs for these are in Appendix D. Full template files are in Appendix A.