SimplifyUX Kanban
The task board a person and a dozen AI sessions share, built so every session works on the job it was given and not its own idea of it. Part of the SimplifyUX suite, the software I'm building for my own company.
SimplifyUX Kanban is the task board at the centre of the SimplifyUX suite, the software I’m building for my own company, SimplifyUX. The design tool, the notes and the console are where the work happens; this is where it is planned, started, finished and checked. A person and a dozen AI sessions share it at once. The screens here show invented projects, so nothing in them is real.
What was broken
AI agents doing real work drift. They improve something nobody asked for. They call a task done because it feels finished. Two sessions start the same job without knowing the other exists. None of this is malice; it is what happens when a capable worker has no boundary written down.
An ordinary task board does not help, because it trusts whoever moves the card. I needed a board that could say no. No to starting work that is not ready, no to a done that is not proven, and no to new work while the current work is unfinished.
How I worked it out
The first board took four days, 16 to 19 July 2026: from an empty folder to cards that move between devices live. It was a kanban from the start, because AI work is naturally card-shaped: one job, one session. In September I tested that choice properly.
The study, and what its own arithmetic said
On 22 September I had an AI compare five ways of running projects: Waterfall, Agile, Kanban, critical path and Lean. Each ran the same ten tasks, 50 simulated runs in all, judged by a final session. It ranked Kanban first. Then I checked its arithmetic, because a study that flatters the method you already chose deserves more suspicion, not less.
None of its five published scores could be reproduced from its own rubric. Agile and Lean scored identically on all seven dimensions, yet were published as 98.0 and 97.2 and ranked second and third. More than a third of the weight, 35 percent, sat on two dimensions where every method scored a perfect 5. The method it called disqualified was marked down 1.7 points more than its own table supports.
The study's scores, checked against its own rubric
Score the study publishedScore its own rubric gives
So I quoted none of its numbers and kept the one claim that held without them. A hard limit on work in progress stops drift before it happens; every other mechanism only notices it afterwards. Then I used the study as a checklist against the board I already had, not as evidence:
| The study | What I did | Why |
|---|---|---|
| A hard limit on cards in progress | Adopted: the board refuses a fourth card and names the three holding the slots | The one sound claim in the study |
| A limit of one card in progress | Refused: the limit is three | One session per board is not how this works; a dozen run at once |
| A definition of done that can fail | Already built, and enforced at the door | A card cannot start without its one-line test of failure |
| Score every card from 1 to 5 on seven dimensions | Refused | A score you give yourself can never go red |
| About twenty extra fields on every card | Refused | Cards were already near their size limit |
| A model to predict time and cost | Refused | Its constants were invented and could not be calibrated |
| Ready and Review columns | Refused | Ceremony, which the study itself ranked as the thing to cut |
The real test
The study’s own simulation predicted that three sessions on overlapping work would duplicate work 11 times and conflict 7 times. On the day it was written, three real sessions worked one copy of the board’s own repository at once. The measured result was no duplicated work and one collision, which was announced before it happened and settled in two messages. The board itself was the shared state, a card in Doing was the lock, and a stale write was refused rather than silently overwriting.
What the simulation predicted, and what happened
Predicted by the simulation, three sessionsMeasured on the day, three sessions
A card’s doors
On 26 September I set the rule that shapes everything since: the board exists to stop drift. Work is cut into releases of two to five outcomes, fixed when the release opens, and every card serves exactly one of them. Each step a card takes is a door that checks it:
- 01CreateIt must name an outcome of the open release, or it is refused.
- 02StartIt needs its required sections, one test of failure, and a free slot in Doing.
- 03FinishThe same check again, so done means proven, not felt.
- 04Close the outcomeWhen every card serving it is done, with one line of evidence.
- 05Close the releaseMy act alone, with a safety statement, once nothing is open.
What I designed
The board is drawn in a Bauhaus language, and the choice is functional, not decorative. Every stage is a shape as well as a colour: a triangle for To do, a square for Doing, a bar for Blocked, a circle for Done. Someone who cannot tell red from blue still reads the board. Projects get a coloured edge, never a primary colour, so a project can never be mistaken for a stage.
A card is a contract, not a note. It has nine sections, from a one-line summary to the hard stops. The last one matters most: the FALSIFIER, a single line naming what a failure would look like. If you cannot write that line, you do not yet understand the task well enough to start it. One falsifier per card is also the size test: work that needs two is two cards.
Refusals are written to teach. Early on, a measurement found that 8 of the 15 refusals the board was making were wrong. The section was there, written in a form the check did not recognise. The check stayed strict, but every refusal now names the exact line, and the release ladder shows a gap honestly as ‘no cards yet’, never as a pass.
What changed
Between 22 and 30 September 2026 I measured the board against its own standard, through its own interface, before and after it started enforcing that standard:
Eight days of the board enforcing its own standard
22 September 202630 September 2026
Every change carries who made it and from which session, so a dozen sessions can work side by side and the history still answers who did what. Every edit is checked against the version that was read, so a session working from a stale copy is refused instead of overwriting someone else’s work.
Under the screens it is small and tested. 60 interface routes over 16 tables. 47 unit test files and 36 browser test files, and on 30 September 192 of 192 accessibility tests passed across 48 pages. It works with scripts switched off, and cards move by keyboard, by pointer or from a menu. In October 2026 it held more than 30 projects.
Commits by month
What I learned
An AI’s study is a good checklist and a bad witness. This one pointed at the right mechanism and got every number wrong. Reading it as evidence would have installed its mistakes in the one place I most needed honest: the definition of done.
Prevent, don’t correct. A rule that is checked after the work is done catches drift once it has cost something. A rule checked at the door costs nothing to keep, and the board taught me to put every rule there.
And a refusal is part of the interface. When 8 of 15 refusals were wrong, the fix was not a gentler check. It was a clearer one, that names the line and says what would let the card through.